Vantomic Radiation Protection · Radiation protection

Radiation protection that learns from its own estimates.

A survey system records what happened. This one changes what you estimate next time — and shows the comparable past jobs behind every range, never a black-box number.

The feedback loop

Estimate, execute, compare, calibrate.

Step 1

Estimate

Pre-job dose estimate on the RWP.

Step 2

Execute

Actual collective dose, measured.

Step 3

Compare

Accuracy percentage, recorded.

Step 4

Calibrate

Feeds the next pre-job brief.

“bottom-up (aggregation of individual task estimates) exposure estimates corroborated by top-down (historical work activity dose rate × duration) estimating methods.”
NRC Inspection Procedure 71124.02 — Occupational ALARA Planning and Controls

Your inspector is already asking for this. The estimate is built from your plant's own comparable past jobs — a range, with the matches shown.

Scope

Not a survey tool. The whole radiation-protection workflow.

It starts read-only, alongside your existing RP systems. Once installed and proven on your site, it is designed to take over from them step by step — one system in place of three, doing what none of them do.

Electronic surveys

Point, route, mobile capture, review, approve, PDF. Designed to take over from legacy survey systems as you progress.

RWPs & ALARA

Create, authorise, check workers in and out. L1/L2/L3 ALARA hold engine built in.

Dose tracking

Individual and collective dose, YTD tracking, personnel roster, limit flags — read alongside your system of record at first.

Live monitors

Area-monitor dashboard, threshold alerts and three-tier escalation to Teams, Slack, SMS.

Scheduling

Fair-draw technician assignments and shift scheduling with confirmation.

NRC reporting

Monthly and annual reports generated on demand, with cryptographic sign-off and archive.

PI historian

Reads OSIsoft / AVEVA PI — 30-year trend pulls for survey-frequency justification.

Migration when you are ready

Assess, dry-run, sign-off, run — brings VSDS, GEDDS and RMS history across when you choose to retire legacy systems.

On the critical path

When RP is the reason, the outage should say so.

RP sits on the outage critical path more often than any schedule admits. Paired with Vantomic Outage Control Center, an RP hold arrives already priced — and with the missing fact, the owning role and the system of record attached.

Combined output

“This radiation work permit is costing you $41,667 an hour — and here is the missing signature.”